East Campus Village

Project timelines occasionally draw skepticism from the construction industry. Take the East Campus Village: 215 beds of new graduate...  

East Campus Village

Project timelines occasionally draw skepticism from the construction industry. Take the East Campus Village: 215 beds of new graduate student housing and a construction schedule of only 11 months. The industry said the challenge was impossible. Chandos delivered – with no compromise to quality or scope.

What's more impressive is the project was LEED® certified and our team was instrumental in achieving the desired certification level. Scope of work included a complete fit-out of the property with drywall, millwork, flooring, fixtures, mechanical and electrical to suit.

Location:
Edmonton, Alberta
Duration:
Eleven Months
Size:
180,000 Sq. Ft.