LRC Annex Block Envelope Replacement

Lethbridge, Alberta

This is our fifth project and third building envelope replacement at the Lethbridge Research Center for Agri-Foods and Agri-Foods Canada. The project will start shortly after the Lab Block completion, and is expected to take 18 months to complete. The replacement is to a three storey research facility at Agri-Foods and Agri-Foods Canada. The building was built in the 80's but was not constructed properly and the envelope failed. The envelope will be replaced with the same air barrier and metal panel system that we have done on the previous two buildings onsite.

« Back to Our Projects