Kinsmen Aquatic Centre

Edmonton, Alberta

This project consisted of the replacement of the mechanical system, extensive pool upgrades, a new dive tank with tower, and noise attenuation panels. The facility was partially operational during construction and our team took great care to not disturb the operation of the facility and therefore was completed at night. This project required that we construct the largest movable scaffold system used in Alberta to install the large diameter ductwork required to improve air quality in the facility. We are proud to say that this project was completed on schedule and on budget.