Kinsmen Aquatic Centre

Edmonton, Alberta

This project consisted of the replacement of the mechanical system, extensive pool upgrades, a new dive tank with tower, and noise attenuation panels. The facility was partially operational during construction and our team took great care not to disturb the operation and work was performed at night. This project required that we build the largest movable scaffold system ever used in Alberta to install the large diameter ductwork needed to improve air quality in the centre. We are proud to say that this project was completed on schedule and on budget.

« Back to Our Projects