This is our fifth project and third building envelope replacement at the Lethbridge Research Centre for Agriculture and Agri-Foods Canada. The work took our national special services group (SSG) 18 months to complete. This building was built in the 80s but was not constructed properly and the envelope failed. The new envelope was replaced with the same air barrier and metal panel system that we used on the previous two buildings at this site.
Location
Lethbridge, Alberta
Size
69,857 sq. ft.
Value
$3,500,000
Client
Public Works and Government Services Canada
Consultant
FWBA Architects
Services
» Strategic Services Group
» Building Envelope
» Construction Management